How Long Does a Kitchen Remodel Take – In a perfect world where nothing goes wrong, all the materials show up on time, and there are no delays with city permits or your condo board, a kitchen remodel can be done in about 3 weeks. But this is the real world, and the average timeline ends up being a few months. Sometimes tiles are broken in transit or your building’s elevator is reserved for people moving for the next few weeks. The granite countertop of your dreams might not be in stock for months, and the cabinet makers might be especially busy this time of year.

When you are planning to remodel your kitchen, you are likely wondering, “How long does a kitchen remodel take?” It is important for you to figure out how long does it take to remodel a kitchen so that you know when to schedule its start date. Many homeowners don’t know what to expect. While the length of the project will depend on the type of the remodeling job and the size of your kitchen, the average time of remodeling is around four to six weeks, which doesn’t include the design and planning phase.

Kitchen Remodeling

Modern L Shaped Kitchen Remodeling with Unfinished Kitchen Cabinet Doors

Fortunately, most people will not have to move out of their homes while their kitchens are being remodeled. Here is what you can expect, including tips on kitchen remodeling as well as a kitchen remodeling checklist for each phase.

How Long Does It Take To Remodel A Kitchen: The Design And Planning Phase

You should take as much time as you need during your design and planning phase. This is important so that you are comfortable with what you will get from your new kitchen. Think about what you want carefully. You should ask as many questions as you need to ask of your design team. Your team will likely use a kitchen remodel tool containing hundreds of questions about everything down to the smallest detail. Make certain that your team is able to show you product and design options in their kitchen remodel tool in a manner that allows you to perform a cost and value analysis so that you can make certain that you stay within your budget.

Kitchen Remodeling Tampa

Remodel Small Kitchen

Small Kitchen Remodels

Tips On Kitchen Remodeling: Products And Materials That Have Long Lead Times

Some products have long lead times for ordering, including custom cabinets, some stone and tile products and custom furniture. It can take three to four months for custom cabinets to be built and shipped to you. Ready-made cabinets can bet at your home within a few days of your order, and semi-custom cabinets may take between four to eight weeks.

Kitchen Remodels On A Budget

Kitchen Remodeling Tips

Kitchen Remodeling Pictures

If you want to have granite countertops, it is a good idea to choose and tag the slab that you like where they are displayed. You should do this before your kitchen demolition is started. If you are having a backsplash tile custom-designed, start that process fairly early in order to allow for the long lead times that are typically associated with stone and tile products.

Seven Phases Of Your Kitchen Remodel: A Kitchen Remodeling Checklist

After you have finished the design and planning phase, you will be ready to get started on the four to six weeks it will likely take to gut your kitchen and start over from scratch. Here is how your remodeling project will proceed through each phase.

Kitchen Remodeling On A Budget

The first step involves the removal of your existing kitchen and then evaluating everything that is exposed. This will take about two days. On the first day, the cabinets, old appliances, flooring and other items will be removed. Then, your team will perform a walk-through in order to evaluate the status of your floor, ceiling and walls. This is important so that your team can determine if anything needs to be modified or corrected before moving on. If something needs to be modified, you should receive a written report detailing what needs to be done so that you can decide what you should do next.

Kitchen remodeling manassas va, how long does a kitchen remodel take, kitchen remodeling rockville md, kitchen remodeling northern virginia, kitchen remodeling baltimore, kitchen remodeling chicago, baltimore kitchen remodeling, kitchen remodel san jose, kitchen remodeling costs

Kitchen Remodeling Ideas

The second phase involves marking the locations of the appliances, light fixtures and electrical outlets. This step should take about one day. It is common for kitchen remodeling projects to need new light fixtures at a minimum. Some may need entirely new lighting systems. The locations of where everything will be should be carefully marked out. This helps the electrician so that he or she doesn’t have to try to guess about the placement using a sketch.

Kitchen Remodel Pictures

The third phase involves setting up and installing the mechanical items. This step will take about five days. During this phase of your remodeling project, new electrical, HVAC and plumbing will be installed. If you have home automation items, those will be installed during this phase as well. After the installations are completed, your municipality will need to inspect them before your team proceeds with installing your insulation and drywall.

The fourth phase involves the installation of your insulation, drywall and flooring. After your inspection has been completed, the insulation and drywall will be installed. Then, your drywall will be finished and primed. Finally, your flooring will be installed before the cabinets are installed.

Cheap Kitchen Remodel

The fifth phase of your kitchen remodel will include the installation of your cabinets and countertops. After they have been placed and installed, your countertops will then be templated and your granite or other natural stone will be prepared for installation. This will take about 10 days. The countertop fabricator will need sufficient time to laser-measure the stone perfectly, get the drawings approved and send the slab to the fabrication crew. Your countertop fabricator will then deliver and install your countertops in your new kitchen.

The sixth phase of your kitchen remodel will involve all of the final finish and painting. The plumbing fixtures, backsplashes and trim will be installed. If you have hardwood floors installed, they will be finished at this time as well. The painting will be completed last.

The seventh and final phase of your kitchen remodel will involve the installation of your appliances and electrical fixtures followed by the final cleaning. This should take about two days. The only thing left after this step is for you to enjoy your brand new kitchen.

Search term of How Long Does a Kitchen Remodel Take :

  • kitchen remodeling manassas va
  • how long does a kitchen remodel take
  • kitchen remodeling rockville md
  • kitchen remodeling northern virginia
  • kitchen remodeling baltimore
  • kitchen remodeling chicago
  • baltimore kitchen remodeling
  • kitchen remodel san jose
  • kitchen remodeling costs

Hi..I'm awesome bloggers (from the worlds of architecture, interiors, furniture, and fashion) to share a favourite corner of their home! Enjoy!